Laserfiche WebLink
Mr. Kent Gorham, CMLRD <br />June 30, 1992 -page 5 <br />r1 <br />U <br />Revised Map Ml (Surface Control)(1 sheet) <br />Revised Map M2 (Sub-Surface Control)(1 sheet) <br />Revised Map M3 (Pre Mine Topography)(5 sheets) <br />Revised Map M4 (Life of Mine Plan)(1 sheet) <br />New Map M6 (Bond Map for Worse Case Year 1994)(2 sheets) <br />Revised Map M10A (1993 Mine Plan)(2 sheets) <br />Revised Map M10B (1994 Mine Plan)(2 sheets) <br />Revised Map M10C (1995 Mine Plan)(2 sheets) <br />Revised Map M10D (1996 Mine Plan)(2 sheets) <br />Revised Map M10E (1997 Mine Plan)(2 sheets) <br />Revised Map M12 (Postmining Topography)(2 sheets) <br />Revised Map M14 (Pre and Post Mining Drainage Profiles)(2 sheets) <br />Revised Map M46 (Mined Areas Reclaimed to Cropland and Future <br />sheets) <br />Revised Map M51 (Drainage and Sediment Control Plan)(4 sheets) <br />Revised Map M52 (Operational Hydrology Monitoring Sites)(1 sheet) <br />Maps Eliminated in PR-3 (1993-1997 permit) <br />Map M9 (Roads)(4 sheets) <br />Map M10A (Topsoil Removal)(4 sheets) <br />Map M10B (Mine Plan)(4 sheets) <br />• Map M10C (Backfilling and Grading)(4 sheets) <br />Map M10D (Topsoil Replacement)(4 sheets) <br />Cropland Replacement Areas )(2 <br />Kent, please call if you have questions or concerns in the initial review of this document. Trapper intends to <br />work diligently with the Division to ensure this permit revision is approved in a timely and efficient manner <br />[o [he satisfaction of all parties involved. <br />Sincerely, <br />~~~ <br />William Agnew <br />Mgr. Environmental Quality <br />PERMIT\COV-LTR] <br />Enclosure <br />w/o encl <br />.M. Stu blefield J.M. Mauern <br />F.A Rowley S.F. Beckett <br />M.W. Wehmanen LW. Henderson <br />W.S. Harding B.D. Nicholwn <br />file <br />• <br />