Laserfiche WebLink
CIRCES Cost Estimatin Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 04a State :Colorado <br />Date :~ -- 01/08/2005 County:Mesa <br />User: GRM Site :S. Fruita Pit <br />Permit or other job action :2005 <br />Task description :tops <br />HOURLY EQUIPMENT COST <br />Bowl (volume) Basis <br />Struck volume <br />Heaped volume <br />Average volume <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cosVhour : $64.24 NA Weight (UST) : 56.34 <br />Operating cosUhour: $112.71 100 Cost data source ; (CRGj <br />Operator cosUhour: $31.95 NA <br />Total unit cosVhour: $208.89 Total fleet cosUhour: 5208-89 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 11,858 LCY <br />Swell Loose <br />factor : NA volume : 11,8$8 LCY <br />Source of quantity take-off :mine /reclamation plan <br />Source of estlmated swell factor : NA <br />HOURLY PRODUCTION <br />Haulino Capacity <br />Basis <br />weight: 2,550 pounds/LCY <br />Material description <br />EaRh -Dry packed <br />Rated payload : 82,000 pounds <br />Payload capacity : 32.16 LCY <br />Cvcle Time (load + haul + spread + retuml <br />Travel time <br />Shift basis : 1 per day <br />23.20 LCY <br />34.00 LCY <br />28.60 LCY <br />Adjusted capacity: 28.60 LCY'•' <br />Loading time <br />Maneuver and spreading time <br />'loading lime per pair on push-pull models <br />0.90 <br />0.70 <br />minutes' <br />minutes <br />Route Distance (feet) Gratle (%) Roll. res.(%) Total res.(%) Velocity (fpm) Travel time (min.) <br />Haul: 800 15.0 5.0 20.0 278 2.88 minutes" <br />Return: 800 ~ -15.0 5.0 -10.0 1,697 0.59 minutes" <br />° navel ume adlusletl for accele2fipn antl deceleration al load and tlump points <br />velocities are rtgx. adainaDle per total resistance shown, not average <br />Job Condition Correction Factors <br />Site altitude (feet) : 4, 600 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor 0.83 (1 shiR/day) <br />Netjob wrrection factor: 0.83 <br />JOB TIME AND COST <br />Flee[ size : 1 Scraper(s) <br />Unit cost : $0.743 /LCY <br />PermiUjob # : M-1981-243 <br />Abbreviation :none <br />Filename : M243-04a <br />Model :Cat 633E Series 2 <br />Total cycle time 5.07 minutes <br />Adiusted Hourlv Production <br />Unadjusted unit production : 338.66 LCY/Hour"' <br />Adjustetl unit producton : 281.09 LCY/Hour <br />Adjusted fleet production : 281.09 LCY/Hour <br />times volume on push-pull rtpdels <br />Total job time : 42.19 Hours <br />Total job cost : $8,812 <br />