Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : 01/06/2005 <br />User : GRM <br />Agency or organization name :DMG <br />Permit or other job action :2005 Update <br />Task description :cut and fill slopes to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank riooer <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.82 NA <br />Operating cosUhour : $69.39 100 <br />Ripper op.cosUhour : $1.96 25 <br />Operator cosUhour : $31.76 NA <br />Total unit cost/hour : $151.93 Total fleet cosUhour : $151.93 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 22,222 BCY factor : 1.330 volume : 29,555 LCY <br />Source of estimated volume :mine <br />Source of estimated swell factor :proAi <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: <br />Average site altitude <br />Material weight <br />State :Colorado <br />County:Mesa <br />Site : S. Fruita Pit <br />16.50 <br />4,600 feet <br />2, 900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />PermiUjob# :M-1981-243 <br />Abbreviation :none <br />Filename : M243-02a <br />8SU Horsepower : 310 <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiff/dal <br />Spoil pile : 0.80 (/nd-rf) <br />Push gradient : 1.36 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.48 <br />Adjusted unit production : 676.01 LCY/hr <br />Adjusted fleet production : 676.01 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 43.72 Hours <br />Unit cost : $0.225 /LCY Total job cost : $6, 643 <br />