Laserfiche WebLink
Shift basis : 1 per day <br />Cost data source : CRG Data <br />ROADABLE EQUIPMENT <br /> Nearest major city or town within project area region : Frmfa <br />TransOOdation CVGe'f me: Non- Total one-way travel distance: 5.0 miles <br /> Roadable Roadable Average travel speed: 350 rrph <br /> Equipment Equipment <br />Haul Ome (hours) = 0.14 0 14 Total non-roatlable mob/tlenab cost' 5231.12 <br />Retum dme (hours) = D 14 0.14 'txo M mps wltn ha I y <br />Load ng bme (hours) = 0.50 NA Total roatlable mob/tleaab cost" 514 99 <br />UOIOading llme(hqurs) 0.50 NA '-o muM MD role I~q <br />Subtotals 1.29 029 <br />JOB TIME AND COST TOtallo0 time: Y.57 hours <br /> Total job mst: JPQ6 <br /> <br />