My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103375
DRMS
>
Back File Migration
>
Revision
>
REV103375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:12 AM
Creation date
11/22/2007 1:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/11/2007
Doc Name
Review Cost Estimate Memo
From
Jim Stark
To
Kent Gorham
Type & Sequence
MT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Minerals And C <br />Permil or other job action :2007 Midterm Review <br />Task description : Bac~ll and Regrade Pond L-2 <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosVhaur : $2174.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 600 CCY factor : 1.125 volume : 675 LCY <br />Source of estimated volume :Map 27 <br />Source of estimated swell factor :CAT Handbook <br />Average push distance : 65 feet <br />Unadjusted hourly production : 1, 752.8 LCY/hr <br />Operator skill : 0.T5 <br />Material consistency : 0.90 <br />pozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Source <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 6,100 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production : 681.60 LCYlhr <br />Adjusted fleet production : 681.60 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.99 Hours <br />Unit cost : $0.300 /LCY Total job cost : $203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.