Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Permft or other job action :2007 Midterm Review <br />Task description :Replace Topsoil from Stockpile M-1 to Facilities Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />043 State :Colorado Permiflob # : C-81-014 <br />06/11!2007 County :Fremont Abbreviation :none <br />JRS Site :Southfield Mine Filename : C014-043 <br />Support equipment -Load area :INA <br />-Dump area :ANA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Raad Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $60.47 NA NA NA $32.63 $7.50 <br />OperatingcosUhour: $119.18 NA NA NA $20.48 $7.33 <br />Ripper op. cosUhour : NA NA NA NA $0.00 NA <br />Operatorcost/hour: $24.95 NA NA NA $24.47 $34.24 <br />Unit subtotals : $204.80 NA NA NA $77.56 $49.07 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $409.20 Support : $(1.00 Maintenance : $128.63 <br />Total work team cosUhour : $535.83 <br />_. <br />MATERIAL QUANTITIES <br />Initial Sweil Loose <br />volume : 10,400 CCY factor : 1.125 volume : 11,700 LCY <br />Source of quantity take-off ;Map 14 and Pages 2.05.3-60 and 2.05.3-60a <br />Source of estimated swell factor :CAT Handbook <br />