Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />042 State :Colorado PermiT<ob # : C-81-014 <br />06/11/2007 County :Fremont Abbreviation :none <br />JRS Site :Southfield Mine Filename : C014-042 <br />Permit or other jab action :2007 Midterm Review <br />Task description :Replace Topsoil from Stockpile L2 to West Loadout <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost Bre <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:INA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Laad area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $60.47 NA NA NA $32.83 $7.50 <br />Operating cosUhour : $119.18 NA NA NA $20.48 $7.33 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cosUhour : $24.95 NA NA NA $24.47 $34.24 <br />Unit subtotals : $204.80 NA NA NA $77.58 $49.07 <br />Number of units : 2 0 0 0 f 1 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $128.83 <br />Total work team cosUhour : $535.83 <br />_ . <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 8,000 CCY factor : 1.125 volume : 9,000 LCY <br />Source of quantity take-off :Map 15 and Page 2.05.3-80a <br />Source of estimated swell factor :CAT Handbook <br />