Laserfiche WebLink
• TABLE OF CONTENTS <br /> Section - --- Subject Pages) <br /> <br /> 1.0 Phase II Bond Release--Introduction 1 <br />- - 1.1 -. Bond Release-P-arcels Management and Reclamation Histories 1 <br /> 1.2 Documentation of Successful Vegetation Establishment 2 <br /> 1.2.1 -Methods 2 <br /> -1.2.2 - Results and Discussion 2 <br /> 1.3 ~opsoil~eplacement-Documentation 6 <br /> 1.4 Sediment Control Demonstration 7 <br /> 1.4.1 Universal Soil Loss Equation 7 <br /> 1.4.2 SEDCAD 4 8 <br /> 1.4.3 Conclusions 11 <br /> <br /> 1.5 Permanent Impoundment Demonstration 12 <br /> TABLES <br /> - -Table 1.2-1 - _Summary.of-Phase-II cropland~ampling results versus 3 <br /> bond release standards. <br /> Table 1.2-2 Trapper Mine 2001 bond release cropland sampling summary. 4 <br />- _ _Table 1.4-1_ _ Summary of Ph_a_se II pre-mining sediment load demonstration. 9 <br /> Table 1.4-2 Summary of Phase II post-mining sediment load demonstration. 9 <br /> APPENDIC ES <br />_ Appendix 1 _ Reclaimed Parcels Management and Reclamation Histories - <br />- --- Appendix 2 - --Vegetation Cover Data Used in SEDCAD Model - <br /> Appendix 3 Sediment Control Demonstration Backup - <br />• MAPS <br /> Map 1 Phase II Bond Release Parcel and Block Delineation and - <br /> Vegetation TransectLocations <br />