Laserfiche WebLink
• 1.3 Topsoil Replacement Documentation <br />Trappe"r is corifident that average topsoil replacement depths meet at least minimum requirements for all <br />parcels included in this Phase II bond release application. Trapper's topsoil replacement monitoring <br />practices have been very uniform throughout the life of mine and are conducted in such a way as to insure <br />adequate topsoil replacement depths. Trapper has always closely monitored topsoil replacement depths <br />by means of concurrent, systematic field depth sampling by trained individuals. This field monitoring <br />always occurs within one to several days of topsoil replacement by scraper crews and is conducted before <br />the crews leave the area. In areas where topsoil is found to be replaced at less than the approved depth, <br />scrapers are-sent back into the area to lay down at least the required topsoil depth. <br />The SL-1 bond release application provided documentation on the adequacy of topsoil replacement <br />depths for all of the reclaimed parcels outlined in this SL-3 bond release application. Please refer to SL-1 <br />Section 2.3 and Appendix 2.3. Topsoil replacement depth data is also summarized in Appendix t (parcel <br />history sheets) of this SL-3 application. <br />u <br /> <br />6 <br />