Laserfiche WebLink
.; <br />• iii iiiiiiiiiiiiiiii • <br />STATE, OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Na[uwl Resources <br />1313 Sherman 51.. Room '_7 i <br />Dem-er, Colorado 80?03 o I v 1 5 1 o N o F' <br />Phone 13031866-3561 TRANSFER OF MINERAL RECLAivIATION PERMIT MINERAL <br />FAX. (3031 93_-8106 & <br />AND GEOLOG`' <br />~~~~'~~® REC LAHATION <br />MINING•SAFETY <br />SUCCESSION OF OPER4TORS <br />•JUP3 2 8 2000 APPLICATION PACKAGE Rill oven: <br />Guvernor <br />Division of Minerals 8 Geology Greg E. Walther <br />E.ecume DBeaar <br />Applicability Mlcnael a Long <br />Dwlsron D~reclor <br />This document applies to mining operations where the current permitted mine operator wishes to transfer the Reclamation <br />Pemut and permitted reclatation responsibilities to a Successor Operator (a new operator). Please Collow the inswctions <br />provided in this package for filing an application; Mineral Rules and Regulations and Conswction Material Rules and <br />Regulations Number 1.12 (Pemut Transfer application requirements) should also be reviewed prior to completing this <br />form. <br />Filir~ Requirements <br />To apply for a transfer please submit the following to the Division of Minerals and Geology (the "Division': <br />1) A "Transfer of Pernit and Succession of Operator" application form, signed and notarized by an authorized <br />representative of BOTH the current permittee and successor operator; <br />2) The Application Fee of ~ 100.00; <br />3) A Performance Warranq~ Form bearing an original notarized signature of an authorized representative of the <br />successor operator; and, <br />4) Financial Waranw: <br />A) You have the option to WAIVE YOUR RIGHT to a thin (30) day processing time to allow the <br />Division time to recalculate the required fmancial .varrann", or. <br />.! <br />B) You may choose NOT TO WAIVE YOUR RIGHT to a thin (30) day processing time. )n such case, <br />the Division will recalculate the required fmancial warranty within sixty (60) days Gom the decision <br />date (the-date the permit is transfered to the Successor Operator). The required RECLAMATION <br />BOND COULD BE SUBSTANTIALLY INCREASED at that time. If the fmancial warranty is <br />increased, you will then be required to post the additional fmancial warrann . <br />This application package contains the "Transfer of Permit and Succession of Operator" application form, and a <br />Perfomtance Waranty form for your use. Rule 4.3 of the Mineral Rules and Regulations and Rule 4.3 of the Conswction <br />Material Rules and Regulations describes the various acceptable Financial Warranty types. Please contact the Division <br />to obtain the appropriate Financial Warranty form. <br />Upon submittal of this application, the application fee, and the replacement performance and fmancial warranties the <br />Division will Vansfer the permit to the Successor Operator. After the transfer is complete the Division will then review <br />the reclamation costs of the pemtitted operation. The Successor Operator will be notified, if additional reclamation bond <br />is required, within 60 days of approval ifyou do not wave your right to a decision within 30 days. Tfie Division will notifi~ <br />both operators upon completion of the penmt cansfe:. <br />