Laserfiche WebLink
<br />RECLAMATION COST SUMMARY <br />• Task No <br />Task Descri <br />tion E <br />t <br />C <br />$ <br /> . <br />p s <br />. <br />ost ( <br />) <br /> 1 Mobilize/Demobilize $ 1,594 <br /> 2 Backfill and Grade Pit Areas $ 24,845 <br /> 3 Rip Roads to 3.' Depth $ 4,680 <br /> 4 Remove Top 1' of Road Surfacing and Backfill in Pit $ 10,908 <br /> 5 Replace Soil Material $ 5,045 <br /> 6 Revegetate Resoiled Areas $ 957 <br /> 7 Maintenance and Reseeding Fee $ 479 <br /> Subtotal Direct $ 48,508 <br /> Indirect <br /> Liability Insurance (1.55%) - $752 <br /> Performance Bond (0.86%) - $417 <br /> Contractor Profit (10%) - $4,851 <br />• Job Superintendent (40 days @ $600/day @ 30% (2.5 hrs./day)) - $7,200 <br /> Subtotal Indirect $ 13,220 <br /> Project Administration (4.25%) $ 2,623 <br /> Total Project Cost $ 64,351 <br /> <br />L-2 Revised May 1998 <br />