My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103250
DRMS
>
Back File Migration
>
Revision
>
REV103250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:03 AM
Creation date
11/22/2007 1:04:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982036
IBM Index Class Name
Revision
Doc Name
EXHIBIT L RECLAMATION COSTS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SUMMARY <br />• Task No <br />Task Descri <br />tion E <br />t <br />C <br />$ <br /> . <br />p s <br />. <br />ost ( <br />) <br /> 1 Mobilize/Demobilize $ 1,594 <br /> 2 Backfill and Grade Pit Areas $ 24,845 <br /> 3 Rip Roads to 3.' Depth $ 4,680 <br /> 4 Remove Top 1' of Road Surfacing and Backfill in Pit $ 10,908 <br /> 5 Replace Soil Material $ 5,045 <br /> 6 Revegetate Resoiled Areas $ 957 <br /> 7 Maintenance and Reseeding Fee $ 479 <br /> Subtotal Direct $ 48,508 <br /> Indirect <br /> Liability Insurance (1.55%) - $752 <br /> Performance Bond (0.86%) - $417 <br /> Contractor Profit (10%) - $4,851 <br />• Job Superintendent (40 days @ $600/day @ 30% (2.5 hrs./day)) - $7,200 <br /> Subtotal Indirect $ 13,220 <br /> Project Administration (4.25%) $ 2,623 <br /> Total Project Cost $ 64,351 <br /> <br />L-2 Revised May 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.