My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103186
DRMS
>
Back File Migration
>
Revision
>
REV103186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:59 AM
Creation date
11/22/2007 1:04:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
1/17/1990
Doc Name
MIDTERM REVIEW Findings Document
From
MLRD
To
PEABODY COAL CO
Type & Sequence
MT2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-8- <br />19. WITHIN 90 DAYS OF THE PERMIT APPROVAL THE 09/25/84 Resolved, <br /> APPLICANT SHALL SUBMIT AtJ ADEQUATE DESIGN 12/31/86 <br /> FOR A SURFACE DISCHARGING DRAIN TO BE <br /> CONSTRUCTED AT THE TOE OF THE PROPOSED F1LL. <br /> SHOULD THIS SURFACE DRAIN FLOW INTO AN EXISTING <br /> SURFACE DRAINAGE SYSTEM, THE APPLICANT SHALL <br /> DISCUSS 7HE EFFECT ADDITIONAL FLOW WILL HAVE <br /> ON THE HYDROLOGIC SYSTEM. <br />20. A QUALIFIED REGISTERED ENGINEER SHALL PERFOIUd 09/25/84 Resolved, <br /> INSPECTIONS AT LEAST BIMONTHLY DURING THE 9/9/67 <br /> CONSTRUCTION AND PLACEMEIJT OF THE UNDERDRAIN. <br /> RECORDS OF THE INSPECTIONS ARE TO INCLUDE DATE, <br /> TIME, INSPECTOR AND OBSERVATION. COPIES SHALL <br /> BE RETAINED AT THE MINE SITE. AFTER COMPLETION <br /> OF THE UNDERDRAIN CONSTRUCTION, COPIES OF THESE <br /> INSPECTION REPORTS SHALL BE SENT TO THE DIVISION. <br />21. WITHIN 90 DAYS OF REVISION APPROVAL, THE 09/25/84 Resolved, <br /> APPLICAIJT MUST SUBMIT A DETAILED PLAN FOR 12/25/84 <br /> EROSION CONTROL USING RIPRAP, EXCELSIOR MATTING <br /> OR OTHER MEASURES TO BE IMPLEMENTED DURING <br /> CHANNEL CONSTRUCTION. <br />22. PEABODY COAL SHALL POST A BOND OR A RIDER TO 09/25/84 kesolved, <br /> THE EXISTING BOND FOR A TOTAL AMOUNT OF 10/1/84 <br /> 53,453,662.00 PRIOR TO IMPLEMENTATIOrJ OF THE <br /> WOLF CREEK PERMIT REVISION. <br />23. WITHIN 90 DAYS OF ITS PUBLICATION, A COPY OF 09/23/86 Ongoing <br /> THE UNITED STATES GEOLOGICAL SURVEY'S <br /> LYSIMETER STUDY MUST BE SENT TO THE DIVISION <br /> AND OSt4 TO PROVIDE ADDITIONAL QUANTITATIVE DATA <br /> ON FL04J RATES AND WATER QUALITY OF THE SPOIL <br /> LEACHATE. <br />24. A PERFORt4ANCE BOND IN THE AMOUNT OF 09/23/86 kesolved, <br /> 56,431,188.00 PAYABLE TO THE STATE OF 2/20/87 <br /> COLORADO AIJD THE UIJITED STATES OF A!•tERICA, <br /> 14UST BE FILED WITH THE DIVISION WITHIN FIVE <br /> DAYS AFTER THE DECISION BECOMES FINAL. <br />25. PEABODY COAL COMPAIJY MUST SUBMIT DOCUMENTATION 06/13/89 Resolved, <br /> TO TriE MINED LAND RECLAMATION DIVISION BY NO 7/14/89 <br /> LATER THAN JULY 14, 1989 WHICH WILL ALLOW <br /> FOR RECLAMATION DELAY ON ALREADY GRADED SPOILS <br /> AROUND FORMER AUGER AREA C. SUCH DOCUMENTATION <br /> SHALL INCLUDE, AT A I.1IN11dU11, REVISED EXHIBIT <br /> 13-2 AND SHALL rJOT ALLOW RECLAMATION DELAY ON THE <br /> SUBJECT AREA BEYOt1D DECEMBER 31, 1989. <br />
The URL can be used to link to this page
Your browser does not support the video tag.