Laserfiche WebLink
PQPQ-y <br />PEABODY WESTERN <br />September 24, 1992 <br />Susan Morrison <br />Colorado Division of <br />Minerals and Geology <br />1313 Sherman Street <br />Suite 215 <br />Denver, CO 80203 <br />RE: Aaiver of Decision Timeframes <br />Dear Ms. Morrison: <br />III IIIIIIIIIIIIIIII <br />999 <br />1300 SOUIh Vdla <br />Flagstall, Arizona 86001 <br />(602)774.5253 <br />~~~i~~ ~ ~~ Ci"` <br />~ ~ p! j <br />~~P 2 ~ i992 <br />As we discussed on September 23, 1992, Peabody will <br />waive the decision deadlines for technical <br />revisions 17 and 18 for the Seneca II-W Mine and <br />minor revision 35 for the Seneca II Mine. <br />Please call if you need anything further. <br />Respectfully, <br />"~ f G~ <br />Fred Fest <br />Manager, <br />Environmental Engineering <br />swl <br />c: Chuck McCulloh <br />Gary Wendt <br />