My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103115
DRMS
>
Back File Migration
>
Revision
>
REV103115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:53 AM
Creation date
11/22/2007 1:03:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
8/17/1994
Doc Name
REQUEST FOR EXTENSION OF DECISION DATE TR 19 CLOSED LOOP MINE DEWATERING PLAN SOUTHFIELD MINE
From
ENERGY FUELS COAL INC
To
DMG
Type & Sequence
TR19
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />.wnnn.le mlrr • pwt Dine. Do>t s1e . na.no.. eobnAO erne .peel rs~-e9ee <br />August I5, 1994 <br />Ms. Shawn Smith <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Request for Extension of Decision Date <br />TR-19, Closed-Loop Mine Dewatering Plan <br />Southfield Mine, Your File No. C-81-014 <br />Dear Ms. Smith: <br />~ECFIv~r <br />AUG 1'~ 1~~~ <br />iii iiiiiiiiiiiii iii <br />999 <br />Ca"S'OII UI hi•4rtc•a a ~.~~~~•~yY <br />With this letter Energy Fuels Coal, Inc (EFCI) requests an extension of the decision date for <br />the above referenced Technical Revision No. 19 concerning plans for aclosed-loop return of <br />mine dewatering flows. The revision includes submittal of MSHA approved plans for <br />breaching seals and routing water within the mine, and calculation of mine volumes for <br />storing the anticipated mine dewatering flows. <br />EFCI has discussed with MSHA its plans to breach seals and change ventilation to facilitate a <br />closed-loop dewatering system. EFCI will submit revised plans to MSHA to breach seals <br />pending their decision on previously submitted ventilation plans for the same azea of the <br />mine. Calculations of mine volumes for water storage aze nearly complete incorporating data <br />from the current Annual Hydrology Report. Given the time required to secure MSHA <br />approval of ventilation plans and make appropriate changes to permit text, and for the <br />Division to review the information, EFCI respectfully requests an extension of the date for <br />decision on TR-19 to September 30, 1994. <br />Please contact me if you have any questions or require additional information concerning this <br />request. <br />Sincerely, <br />Energy Fuels Coal, Inc. <br />Allen S. Weaver ~~ <br />Mine Engineer <br />cc: Randy Acre (EFCI) <br />Tom Leidich (TerraMatrix) <br />
The URL can be used to link to this page
Your browser does not support the video tag.