Laserfiche WebLink
OCT 15 '99 04:09PM PERBO~WSTN SENECR MINE • p,q <br />1. Text - replace entire existing text section with new pages <br />2. Remove Attachment 20-1, Reclaimed Drainage Calculations, <br />from the permit volume <br />3. Exhibit 20-1, 5-Yr Disturbance Boundary (Sheet 2 of 2) - <br />insert page that says "5 Year Disturbance Boundary has been <br />superseded by Exhibit 12-1, Operations Plan (Sheet 2 of 2)" <br />4. Exhibit 20-2, Postmining Topography (sheet 2 of 2) - replace <br />existing exhibit with new exhibit <br />5. Remove Exhibit 20-3, Premising Slope Map, and replace with <br />Exhibit 20-2A, Pre and Post Mining Cross-Sections <br />6. Remove Exhibit 20-4, Postmining Slope Map, and replace with <br />Exhibit 20-25, Post Mining Drainage Channel Profiles <br />Tew ~~;*eae~1 Racea~tzuc}fen. Vnluma 9 <br />1. Text - replace existing Tabie of Contents with new ToC <br />2. Text - replace existing pages 7 through 12, 17, 18, 19 and <br />20(05/26) with new pages <br />Tnh 2~ wveQA s ~ ~ pan. yel~~w 10 <br />1. Text - replace existing TOC pages i and ii with new pages <br />2. Text - replace existing pages 11(07/15), 13, 21, 22, 25, 26, <br />27, 24(07/15) and 34 with new pages <br />3. Exhibit 22-1, Postmining vegetation Map (sheet 2 of 2) - <br />replace existing exhibit with new exhibit(07/15) <br />