Laserfiche WebLink
OCT 15 '9g 04~08PM PERE~ WSTN SENECR MINE • p,z <br />2. Text - replace existing pages 3 through 6, 11, 12(05 26), <br />12a(09/07), 15 through 18b(07/08), 22 and 31(05/26) wit new <br />pages <br />3. Insert new Attachment 13-6A, Ground Stability Investigation, <br />Yoast Mine and Vicinity, following Attachment 13-6(09/07) <br />Tab 7~~ Fae{l+ti®o~. Vo1t~e 6~,(Nwv Volumel <br />1. Insert new Attachment 13-12, Drainage and Sediment Control <br />Plan - Include between volume 6 and Volume 7 <br />In Attachment 13-12, Drainage and Sedimeat Control Plaa: <br />1. Text - replace cover page(O6/28) and pages 3(06/28), <br />5(06/28), 6(05/26), 7(05/26), and 8(05/26) with revised <br />pages <br />2. Replace Figures 13-12.2(06/28) and 13-12.3{05/26) with new <br />figures <br />3. In Appendix 13-12.1, Sediment Ponds SEDCAD4 Results, replace <br />Pond 12 - l0yr/24hr section(OS/26) and 25yr/24hr <br />section(06/26) <br />4. In Appendix 13-2.3, Post Mining Channels SEDCAD4 Results, <br />replace all existing channel results with new results <br />(05/26), except for YPM-i, 3, and 5(09/07) <br />5. Exhibit 13-12.2, Proposed Pond 012 Design, replace existing <br />exhibit with new exhibit(06/2B) <br />6. Exhibit 13-12.3, Proposed Pond 013 Design, replace existing <br />exhibit with new exhibit(07/15) <br />7. Exhibit 13-12.4, Proposed Pond 014 Design, replace existing <br />exhibit with new exhibit(07/15y <br />2. Insert new Attachment 13-13, sedimentation Pond 012 <br />Stability Analysis, following Attachment 13-12(05/26) <br />3. Insert new Attachment 13-14, Haul Road B Extension <br />Instability Investigation, following Attachment 13-13(05/26) <br />4. Insert new Attachment 13-15, Pond 013(07/15) and 014(09/29) <br />Stability Analysis, following Attachment 13-14 <br />5. Insert new Attachment 13-16, Haul Road D Stability Analysis, <br />following Attachment 13-15(09/07) <br />