Laserfiche WebLink
(5) The statement required in (4) ^hove shall also include <br />any recoimnencL•itions the Division of IVildlifc may wish <br />to make regarding the proposed olreration. <br />12. IVatcr Resources. <br />a. A11 operations over ten (10) act'cs. A narrative, stq~plc- <br />mcnte wrtTdsagrams mr test the water resourccs on and <br />in tJre vicinity of the application area, shall be submitted. <br />Such narrative shall include: <br />/(1) Botlr surface and curdcrgroruid resourccs; mid <br />i(2) A description of the impact of the operation on the <br />quality and quantity of water resourccs; and <br />~ (3) Ucmonstration of water right .ownership to supply any <br />necessary water rec{uirements for operations or impound- <br />ments, wlrcther temporary or pernranerrt; and <br />(4) All necessary permits and certificates from the offices <br />of tlic Colorado IVatcr' Quality Control Division and the <br />Colorado State Cngineer; and <br />(5) It rto permits or certificates arc necessary, the opera- <br />tor shall submit a written statement from the above <br />tiro agencies wiriclr states that none are necessary; and <br />(li) T1ic State lingi.neer and the IVatcr Quality Control Divi- <br />sion may submit a written statement making any recom- <br />mendations they may have concerning the operation. <br />b. All o orations oC ten (10) acres or less. <br />(1 A description o tie sur ace and undergrowrd water r'e- <br />• sources; and <br />(2) A description oC the impact of the proposed operation on <br />tlrc quality mid yuatrtity of t}resc resourccs; and <br />(3) All necessary permits :rnd certificates Crom the offices <br />oC the Colorado IVatcr Quality Control Division and the <br />Colorado State Cnginccr; and <br />(4) If no permits or certificates are necessary, the opera- <br />tor shall submit a written statement from the above two <br />agencies which states that none are necessary; and <br />(5) 1'hc State Engineer and the Water (~rality Control Divi- <br />sion may submit a roritten statement making any recom- <br />mendations they may have concerning the operation. <br />13. 11re operator's estimated costs of each of the following segments <br />of the reclamation process, including where applicable back- <br />filling, grading, higliwal] reduction, topsoiling (if clone), <br />p]:rntiiig, -rcvcgctntion managcnicnt-and pi'otcction prior to vcgcta- <br />tion establistunen[, and administrative costs. At the request o[ <br />tlrc operator information pertaining to the detailed breakdac~nr of <br />tiro cost of reclamation may be held confidential upon a showing <br />of good cause. <br />lA. A timetable stating the periods of time which will he rcyuircd <br />for the various stages of the mining and reclamation operations. <br />L J <br />