My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102992
DRMS
>
Back File Migration
>
Revision
>
REV102992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:43 AM
Creation date
11/22/2007 1:02:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
1/5/1998
Doc Name
WEST ELK MINE PN C-80-007 MNR REV NO 235 REPPONSE TO STIPULATION 67 REVISED MODEL FOR POND MB 2R
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
MR235
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLGIIIIIIIIIIIIIIIIIII <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1 31 1 Sherman St.. Room 215 <br />Denver, Cu~orado 8(1203 <br />Phone: 13031 Afib-35fi7 <br />FltX: (3031 A32-8106 <br />January 5, 1998 <br />Christine E. Johnston <br />Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Re: West Elk Mine (Permit No. C-80-007) <br />Minor Revision No. 235 <br />Response to Stipulation 67-Revised Model for Pond MB-2R <br />Dear Ms. Johnston: <br />~~~ <br />DEPARTIvIENT Of <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />dames 5. Lochhead <br />Executive Director <br />nLChaeIB Long <br />Drvuion Director <br />We have received your application for a minor revision to your permit to conduct coal mining in <br />Colorado. Our initial review indicates that all preliminary items required by Rule 2.08.4(5) have not <br />been submitted. Thus, your application is incomplete for the purposes of filing as of December 30, <br />1997. <br />The revision application did not include design information and supporting calculations for the ditch atd <br />culvert sizing proposed in the MB-2R watershed. In order for the revision to determine the adequacy <br />of the proposed structure sizing, MCC needs to provide this information. In accordance with Rule <br />2.07.3(1), you have the opportunity to amend, review, or otherwise make your application complete. <br />If you have any questions, please contact me. <br />Sincerely, <br />,~ o <br />Michael P. Boulay <br />Envirorunental Protection Specialist <br />MPB/JRC <br />M. \OSS\1RC\TEM P\CM R01007. M PB <br />
The URL can be used to link to this page
Your browser does not support the video tag.