Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />001 State :Colorado Permitfjob # :C-80-006 <br />11/232005 County :Jackson Abbreviation :none <br />JHB Site :MamMine Filename:0006-001 <br />Permit or other job action : Rn5 2005 <br />Task description :Remove Material from Access Road to Pond G <br />HOURLY EQUIPMENT COST <br />Description <br />Cost Bre <br />Shift basis : 1 perday <br />Scraper work team -Scraper :Cat 621G <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :~NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $37.06 NA NA NA NA NA <br />Operating cosUhour : $79.46 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />OperatorcosUhour: $32.15 NA NA NA NA NA <br />Unit subtotals : $148.68 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $148.68 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $148.88 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 2,962 CCY factor <br />Source of quantity take-off :Permit Volume 12, <br />Source of estimated swell factor :CAT Handbook <br />Loose <br />1.060 volume: 3,140 LCY <br />28R <br />