My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102987
DRMS
>
Back File Migration
>
Revision
>
REV102987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:43 AM
Creation date
11/22/2007 1:02:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
11/25/2005
Doc Name
Review Memo
From
Janet Binns
To
Jim Burnell
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:: <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />Basis <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth - Drv oacked <br />Rated payload : 48,000 pounds <br />Bowl (volume) Basis <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />Payload capacity : 18.82 LCY "' hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (Fl.) : 8,200 <br /> Scraper Push dozer Source <br />Scraper loading time' : 2.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />'load time per scraper pair on push-pull motlels Net COrreCtlOn : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 400 5.00 5.00 10.00 740 0.56 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.56 minutes <br />Return route <br />minutes <br />table velocities are max. attainable per total resistance shown, not averege <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.53 minutes <br />Unadjusted unit production/hour: 288.67 LCY/hour "' Adjusted forjob conditions : 239.60 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 239.60 LCY/hour <br />Adjusted multiple scraper team (Fleet) hourly production : 239.60 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 6.95 Hours <br />Unit cost : $0.621 /LCY Total job cost : $1,033 <br />"travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.