My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102922
DRMS
>
Back File Migration
>
Revision
>
REV102922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:38 AM
Creation date
11/22/2007 1:01:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/31/2005
Doc Name
2nd Adequacy Review Letter
From
DMG
To
Twentymile Coal Company
Type & Sequence
TR48
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 27 5 C O L O R.A D O <br />Denver, Colorado 60203 D t v t 5 1 o N O F <br />Phone: (303J 8663567 M I N ERA L S <br /> <br />FAX: (303) 832106 G E O L O G Y <br /> 0.ECLAM ATION•MINING <br /> SAf ETY•ECIENCE <br />August 31, 2005 <br /> Bill Owens <br />Jerry M. Nettleton cGVernGr <br />Environmental Coordinator Russell George <br /> Executive Director <br />Twentymile Coal Company <br /> Ronald W. Cottony <br />29515 Routt County Road #27 Division Director <br />Oak Creek, CO 80467 Natural Resoun a Trustee <br />Re: Foidel Creek Mine, Permit C-1982-056 <br />Technical Revision 4-48 (TR-48) <br />Technical Adequacy, Second Review <br />Dear Mr. Nettleton: <br />The Division of Minerals and Geology (Division) has, after receipt of the changes under <br />your letter of August 24, 2005, completed a review of the subject Technical Revision <br />application (TR) for technical adequacy. Three minor items require resolution. Please <br />address the requests presented in the following items with regard to the proposal to <br />construct the 6 North Mains Shaft and Associated Equipment and Facilities. Any revised <br />or added pages developed in response to the requests should be submitted with the date of <br />response annotated in the lower right hand corner. <br />Item 1. Page 2.05-45.6b. Lines 25 and 26. The discussion of compaction with regard to <br />the sedimentation pond conflicts with other descriptions of this feature. This feature is <br />described elsewhere as being an incised pond, with no embankments. Please delete so <br />much as reads "The sediment pond will be constructed by placing and compacting 8 <br />to 12 inch lifts of fill material to 95 percent of maximum standard Proctor Density.", <br />or explain it purpose with regard to the other descriptions. <br />Item 2. The revised page 2.05-45.7, 08/22/05, omits the discussion with regard to the <br />(previously approved) Buffalo Forge Fan Silencer, and, as such, there is a loss of such <br />approval and continuity of text with unchanged page 2.05-45.8 (07/2/05). Please revise <br />the submission accordingly. <br />Item 3. The first 11 lines of text on revised page 2.05-84.2, 08/22/05 duplicate (with the <br />exception of the leading word) the last seven lines of unchanged Page 2.05-84.1, <br />07/02/05. Please revise the submission to eliminate the duplication and to provide <br />text continuity. <br />Item 4. Please note [Rule 4.06.2(2)(ii)] that a variance, approved by the Division, is <br />required to exercise the option of geotextile over topsoil in lieu of removal of topsoil. <br />Such a vaziance needs to be identified on appropriate drawings and maps, and the <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.