My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102911
DRMS
>
Back File Migration
>
Revision
>
REV102911
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:37 AM
Creation date
11/22/2007 1:01:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
12/28/1984
From
ANACONDA MINERALS CO
To
MLRD
Type & Sequence
HR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ANACONDA Mlnerels Com~ny <br />555 Seventeenth Street <br />Denver, Colorado 80202 <br />Telephone 303 293 4000 <br />December 27, 1984 <br />Mr. Robert Liddle <br />Senior Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Bob: <br />III II/IIIIIIIIII III <br />999 <br />RECEIVEp .. <br />DEC Z$ 199a <br />MINED UND REp1AMAT1pN DIVISfON <br />Colo. Dept of N~tunl Resources <br />This is to request a minor revision to the Mt. Gunnison No. 1 <br />Underground Mine Mining and Reclamation Plan approved as part of CMLRB <br />Permit C-007-80 issued in July, 1981. West Elk Coal Company (WECC), <br />operators of the Mt. Gunnison Mine wish to~,„construct a second coal <br />crusher adjacent to the existing crusher, loea'ted at the breaker building <br />as shown on attached Drawing 001. A'schematic of the proposed crusher <br />is shown in Drawing 002. If any substantial changes are made to the <br />schematic a new drawing will be submitted to you. <br />No additional conveyors will be installed for the new crusher since the <br />existing 1000 TPH portal to breaker conveyor (mine conveyor) will serve <br />both crushers. Coal will be divided between the crushers via a pantleg <br />chute off of the mine conveyor. Coal from both crushers will be <br />conveyed to the storage silos via the existing 1000 TPH coal silo <br />conveyor. Maximum throughput capacity of the new crusher is estimated <br />to be 650 TPH. However, combined throughput of the two crushers will <br />not increase from that currently designated for the present crusher (500 <br />TPH) since the two crushers will not operate in tandem. Only one <br />crusher at a time will operate. The new crusher will be enclosed as <br />well as equipped with a water/surfactant spray to minimize dust <br />emissions. <br />The crusher will be constructed on footings on previously disturbed <br />surface. Thus no additional disturbance will be necessary. All runoff <br />from the area drains into the present drainage ditch on the inside of <br />the access road and into Sedimentation Pond No. MB 2. <br />Demolition costs for this crusher were estimated in the same manner as <br />used for determining demolition costs of other surface facilities at Mt. <br />Gunnison. That is, demolition costs were estimated to be 15% of the <br />construction labor costs. Salvage value of the material was not <br />included. Since the area upon which the new crusher will be located was <br />already included in the acreage to be reclaimed in our original bonding <br />calculations, no additonal costs for reclamation of this area are <br />included in this application. Total demolition costs for the new <br />crusher are estimated to be $15,000. <br />4NACON04 Mine rats Cam pany n a On~sion of ApanecP¢M1l map Company AMCO~d000~• IB BJI <br />
The URL can be used to link to this page
Your browser does not support the video tag.