Laserfiche WebLink
Mr. Archer <br />3 October 91 <br />Page 2 <br />has a flow capacity in excess of the primary dewatering device. With <br />proper stored sediment removal, Sun Coal Company can expect proper <br />functioning of the Yampa Pond for the duration of their reclamation <br />procedures. <br />Respectfully submitted, <br />~~ <br />~, -:=' <br />Eugene M, Shearer, P.E. <br />Consulting Geologist <br />EMS:mjs <br />Enc. 2 <br />Q G\StERfJ <br />v ~ c1;~, " <br />A ~. <br />\ CF,` <br />u~~ ~S3/G N PL f j. ~~; <br />