Laserfiche WebLink
<br />Topsoil Replacement <br />Seed COSts <br />Labor cost Yor seeding <br />Fertilizer <br />Trees <br />~,~Cp~u~oy ~I,.~r lln~ly <br />,.:, ~ ~~, <br />~ ~..~ <br />RECLAMATION COSTS <br />Brownwaod •2 <br /> <br />UNIT COST NUMBER OF UNITS COST <br />(0.50/ C.Y. 14,117 C.Y. (7,088.50 q" <br />(59.20/AC 17.5 AC f 1.036.00 <br />f 50.00/AC 17.5 AC f 875.00 <br />(40.00/AC 17.5 AC f 700.00 <br />(50.00/fiA 20 EA ;1.000.00 <br />~~~4r'~ ?~ ~"Il~~xcc.,y~y Total Reclamation Costs <br />(q~«~~ ~4i~~su <br />Notes: <br />io ~ 58v <br />rk <br />rk <br />~k . <br />',... .n. <br />z~~C~ ~I S~i. .l( <br />;~r <br />iti~ ~ zti <br />a <br />Ir ~ yeti <br />Topsoil replacement costs include haul and placement of topsoil is areas to <br />be reclaimed. Also included are costs to place and grade material is order to <br />produce irregular shorelines around ponds. This cost may appear low, but is <br />based on our machine rates and anticipated time to complete the work as the <br />topsoil will be available on site and the haul distances will be shat. <br />Seed cost is based on doubling the application rate shown in Bihibit E <br />Labor cost of seeding includes seedbed preparation and the seeding <br />operation. <br />Fertilizer coat includes fertilizer and application. <br />Tree cost includes material and labor. <br />It will take appro=imately 177,500 C.Y. of overburden to fill in Area 2A. <br />Haulage distance will not be greater than 1400 feet as the overburden will <br />come from the stockpiles located in Area 3A (the overburden from Areas 1 A <br />and 2A) and the overburden stripped from Area 3A. The cost for filling <br />Area 2A is not shown in the reclamation oust, as it part of the cost of <br />operating the pit and not, in our opinion, a cost of reclaiming the pit. <br />Revised 10/13/86 ~~ ~d~,~'°pO <br />~^ ~~~b5~ <br />f 10,699.50 <br />