Laserfiche WebLink
,,. <br /> <br />James L. Schmieding <br />15 June 1979 <br />Project No. 0057-24-02-01 <br />Page 4 <br />PIT N0. <br />APPROXIMATE DATES <br />1 Sept. 1979 - Nov. 1982 <br />2 Dec. 1982 -Sept. 1988 <br />3 Oct. 1988 -July 1990 <br />4 Aug. 1990 -Sept. 1994 <br />Final Reclamation Sept. 1994 - Sept. 1995 <br />c. Mining is expected to begin September 1, 1979. <br />d. A letter is attached from the Assistant to the Public Works <br />Director stating the City of Loveland has approved use <br />of the pit fora landfill and who will maintain it. <br />4. Water Information <br />a. Proof that the operator can augment water from 5/6 of a <br />share of Big Thompson Ditch and Manufacturing Company water <br />has been submitted and may be found in Exhibit P which is <br />a copy of the Deed of Trust. Reference to the water rights <br />is made on Exhibit "A" of the Indenture dated t4ay 4, 1978. <br />5. Vegetation Information <br />The attached Soil Conservation Service (SCS) report breaks down <br />the vegetation more accurately. The irrigated crop, pastures, <br />junk yard, overflow, and riverwash areas mentioned in the report <br />are shown on Exhibit C. <br />6. Reclamation Costs <br />a. The following is a breakdown of the Reclamation costs similar <br />to Exhibit L but the costs have been increased since the <br />seed recommended by the SCS is more expensive than the seed <br />in the original proposal and I have added labor costs for <br />seeding. <br />UNIT COST NUMBER OF UNITS COST <br />Topsoil Replacement $0.35/yd.3 25,894 yd3 $ 9,063.00 <br />Seed costs $53.21/acre 34 acre 1,809.00 <br />Labor costs for seeding $10.00/acre 34 acre 340.00 <br />Trees $32.00/tree 20 trees 640.00 <br />Total Reclamation Cost $11,852.00 <br />