Laserfiche WebLink
<br />OTHER ISSUES <br /> <br />AT THE PRESENT TIME, TEZAK HEAVY EQUIPMENT CO., INC., IS IN NEGOTIATION <br />WITH THE CITY OF CANON CITY TO DEVELOP A PRIVATE ACCESS INTO AND OUT <br />OF MINE PROPERTY ACROSS CITY PROPERTY DIRECTLY NORTH OF TUi\'NEL <br />DRIVE, THE EXISTING ACCESS ROUTE TO THE MINE SITE. THIS ROADW,4Y <br />EASEMENT WILL BE LOCATED WHOLLY ON CITY PROPERTY WITH THE i i{PRESS <br />GOAL OF ALLOWING ACCESS TO THE MINE PROPERTY WHILE MINIMIZITJG <br />TRAFFIC RELATED IMPACTS TO THE RESIDENTIAL AREA ALONG TUNNEL DRIVE. <br />A RIGHT-OF-WAY LOCATION AND ENGINEERED ROAD CONSTRUCTION DESIGN <br />HAS BEEN PRESENTED TO THE CITY OF CANON CITY FOR REVIEW AND <br />APPROVAL. DETAILED ENGINEERED DRAWINGS OF THE PROPOSED EASEMENT <br />AS SUBMITTED TO THE CITY OF CANON CITY ARE INCLUDED IN THIS <br />APPLICATION AS NOTED AND FIVE ACRES OF AFFECTED LAND HAVE BEEN ADDED <br />TO THE TOTAL TO REFLECT THAT ACREAGE NECESSARY TO INCLUDE THE ROAD <br />EASEMENT WITH THIS PERMIT AMENDMENT APPLICATION. A FTNAL[ZE.D AND <br />SIGNED EASEMENT AGREEMENT WILL BE INCLUDED WITH THIS AMENDMENT <br />PACKAGE AS SOON AS IT IS AVAILABLE. <br />31 <br />