Laserfiche WebLink
<br />(e) RECLAMATION SCHEDULE AS INTEGRATED WITH THE MINING PLAN <br />time frame area & location sequence <br />1996 30 acres SWMP area third, fourth quarter <br />North of mining area 1996 or asap after <br />DMG approval <br />1998 30 acres SWMP area fall 1998 <br />2000 30 acres SWMP area fall 2000 <br />200 ] 30 acres SWMP area Bond release <br />2005-2020 ~highwall area west boon begin final highw;rll <br /> configuration <br />2030-2046 main pit area topsoiUplant medium <br />hauled to main pit area, <br />revegetation of main <br />pit area begins <br />(f) reclamation process details: <br />(i) tnal bRading-- final grades in the highwall area will be 0.25 : I with 40'vertical runs and 20' <br />benches. Rock faces will be left as rock outcrop with benches graded to toe of vertic~il face at <br />5% slope. Final grades within topsoiled main pit area will be kept at 2.5 : I where po<_sible. <br />Final grades of Stormwater sediment pond area north of mining area will be 3:1 on outslope of <br />sediment ponds. Rip-rapped inlets and spillways from one sediment pond to another in the <br />system may have slopes up to 2:1. <br />(ii) Seeding mixtures--mixtures will be a minimum often species from the list of grasses, <br />shrubs, and tree species on page 14 of this application, based on price and availability at the time <br />of purchase. The operator will attempt to include at least four species of woody stem plants in <br />each seed mixture. <br />16 <br />