<br />b) Stormwater run-off from the highwall area can be more efficiently collected and directed <br />from the highwall benches to the lower storm ditch network and eventually to the large sediment <br />pond system in the north end of the affected land iftopsoil/fines is not placed on the mining <br />benches. Sedimentation of the collection ditches will result in high maintenance demands of the <br />storm ditch system and tendency to plug during times of high intensity events. <br />c) The intent of the mining law is to promote site stability and impact control. This I;oal is more <br />readily achievable if the highwall benches are not a source of sediment loads during :>torm <br />events. The rock faces, if left in the configuration as shown in the attached drawing, will best <br />meet these requirements without attempting to revegetate the benches. The general drainage <br />direction of the toe-to-drain ditches located at the toe of each vertical face run will bt: to the <br />North to facilitate the overall site drainage to the north end of the affected land into the SWMP <br />containment area. <br />2) PROTECTING NEIGHBORING LAND AREAS FROM STORM FLOWS <br />STORM WATER MANAGEMENT PLAN <br />At the present time, the drainage from the mining area and from the large (> 100 ac) watershed <br />area to the west of the mining area flows basically to the South along drainage of topographic <br />control which have been operating as such for hundreds of years. The construction o.° sediment <br />ponds along the main haul road have helped somewhat in retaining stormwater tows. although <br />the paving of the main haul road for dust control has tended to promote somewhat higher <br />stormflow velocities and has directed storm waters down the paved roadway onto Tunnel Drive. <br />Historically, stormwater has crossed Tunnel Drive and Flowed into the Hydraulic Ditch which <br />flows in an eastemly direction app. 50' South of Tunnel Drive. This storm path is considered <br />unacceptable to the Canon City Hydraulic Ditch Company and to land owners along ",unnel <br />Drive. This amendment proposes to eliminate all stormwater flows from crossing Tunnel Drive <br />in the future up to and including a 100 year storm event by way of construction of retention <br />ponds within the mine site, along and at the bottom of the existing haul road, and diverting app. <br />90°ro of stormwater flows away from Tunnel Drive and North to a network of sediment control <br />and retention ponds located on Tezak Heavy Equipment Company property. A minimum of <br />seven retention ponds with total capacity of app. 20 acre feet of storage will be constructed to <br />attain this goal of diversion and retention of s[ormwater flows. <br />The construction of sediment ponds, inlets and spillways will take place during 1996 ;tnd <br />revegetation of the outslopes and disturbed areas within the SWMP area will be performed as <br />soon as possible after construction. All construction will be in accordance with the engineered <br />design plans submitted with this application. All construction methods will be reviev<ed and <br />approved by a registered engineer and certified for proper installation. Revegetation of the <br />course alluvium derived soils will entail grading to 3:1 slopes on the sediment pond outslopes, <br />contour furrowing, and broadcast seeding of all disturbed areas with a mixture of nati~ie grasses, <br />shrubs, and tree species found growing in [he area at the present time. A species list will be <br />13 <br />