Final Reclamation Timetable <br />The site will be mined and reclaimed in phases in order to minimize the disturbed azea. It is <br />expected that at the end of the mine life all areas except for the last mining area and the staging <br />area (Original Pit) will be reclaimed. All fina] reclamation tasks for this scenario can be seen <br />below. <br />Final Reclamation Time Table <br />Task Description Duretion (Months) <br />Remove Foundations at 0.50 <br />both Scott Expansion and <br />Orginal Pit <br />Re-grade Final Slopes of 0.25 <br />Scott Expansion Area 3- <br />Phase 5 <br />Topsoil Disturbed Area of 0.10 <br />Scott Expansion Area 3- <br />Phase 5 <br />Disc Topsoiled Areas of O.10 <br />Scott Expansion Area 3- <br />Phase 5 and Wetland <br />Fringe of Orginal Pit <br />Seed and Mulch Dry 0.25 <br />Rangeland Area of Scott <br />Expansion Area 3-Phase 5 <br />Seed Wetland Areas of 0.25 <br />Scott Expansion Area 3- <br />Phase 5 and Orginal Pit <br />Remove Water Control 0.25 <br />Stucutres(Bertns, Ponds, <br />Etc.) <br />Total <br />1.70 <br />8!25/04 Page E-6 <br />