Final Reclamation Timetable <br />The site will be mined and reclaimed in phases in order to minimize the disturbed area. It is <br />expected that at the end of the mine life all areas except for the last mining area and the staging <br />area (Original Pit) will be reclaimed. All final reclamation tasks for this scenario can be seen <br />below. <br />Final Reclamation Time Table <br />Task Description Duration (Mouths) <br />i Remove Foundations at 0.50 <br />both Scott Expansion and <br />' Orginal Pit <br />Re-gade Final Slopes of 0.25 <br />Scott Expansion Area 3- <br />Phase 5 <br />' Topsoil Disturbed Area of 0.10 <br />Scott Expansion Area 3- <br />Phase 5 <br />Disc Topsoiled Areas of 0.10 <br />' Scott Expansion Area 3- <br />Phase 5 and Wetland <br />, Fringe of Orginal Pi[ <br />' Seed and Mulch Dry 0.25 <br />Rangeland Area of Scott <br />Expansion Area 3-Phase 5 <br />' Seed Wetland Areas of 0.25 <br />Scott Expansion Area 3- <br />Phase 5 and Orginal Pit <br />Remove Water Control 0.25 <br />Stucutres(Bertns, Ponds, <br />Etc.) <br />Total 1.70 <br />8125/04 Page E-6 <br />