My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-08_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2007-01-08_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:21 PM
Creation date
11/22/2007 12:57:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
Revision
Doc Date
1/8/2007
Doc Name
Adequacy Response
From
Envioronment, Inc.
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENT. INC. <br />THOMPSON PROPERTIES <br />PERMIT # M-1 993-7 02 <br />ADE4LIACY RESPONSE <br />JAN4ARY HI 2007 <br />TMOMPSON RES OLIRCE PIT <br />PAGE 2 <br />6. Attached is the groundwater monitoring plan and mitigation <br />plan proposed by the operator. In addition, I have attached <br />a second report from ERO Resources providing site specific <br />information regarding the water table in and around the <br />mine. <br />7. At this time no water is used at the mine for development, <br />mining or reclamation. No water will be used for reclama- <br />tion or development but starting this spring water will be <br />needed for dust control. It is estimated that 3.0 acre-feet <br />+/- per year will be needed. The following table shows the <br />estimated monthly distribution. The actual need may change <br />due to weather and monthly precipitation so the numbers <br />should be used as estimates only. <br />rMONTH MONTHLY USE! <br />(AC-$RJ RUNNING TO-. <br />TAL ](AC-FT) <br />January 0 0 <br />February 0 0 <br />March 0 0 <br />April 0.20 0.20 <br />May 0.40 0.60 <br />June 0.55 1.15 <br />July 0.60 1.75_ <br />August 0.55 2.30 <br />September 0.40 2.70 <br />October 0.30 3.00 <br />November 0 3.00 <br />December 0 3.00 <br />Total 3.00 <br />Thompson's are discussing a possible washing operation on <br />the site but until adequate water is available a wash plant <br />will not be installed. If this happens we can determine the <br />water needs once the wash plant is purchased. It will be a <br />closed system where the dirty water is cycled thru silt <br />ponds and reused. The water will be purchased from a local <br />provider and all Colorado water laws will be followed. <br />8. Dust control water will purchased from a local water pro- <br />vider and hauled to the mine. In addition, Thompson Proper- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.