My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-02-16_REVISION - M2004025 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004025
>
2005-02-16_REVISION - M2004025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:42 PM
Creation date
11/22/2007 12:57:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Revision
Doc Date
2/16/2005
Doc Name
SO Approval Request for FW and PW
From
DMG
To
Farnsworth Construction & Gravel Co.
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 05a State :Colorado <br />Date : 02/11/2005 County :Delta Abbreviation :none <br />User : SSS Site :North Fork Pit Filename :M025-05a <br />Agency or organization name <br />Permit or other job action : SO-01 <br />Task description :Rip 3.9 acres above water level <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no.1 :ROPS Cab <br />Attachment no. 2 :3-shank <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $40.64 NA <br />Dozer operatingcost/hour : $48.13 100 <br />Ripper operating cosUhour : $5.95 100 <br />Operator cost/hour : $31.76 NA <br />Total unit cost/hour : $126.47 Total fleet cost/hour : 5126.47 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Altemate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 3.90 acres Rip depth (ft) : 1.00 Volume : 6,292 BCY or CCY <br />Source of estimated quantity :3.9 cares ripped to 1 ft depth <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unad}usted producton : NA cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feet/pass <br />Average ripping width : 6.50 feetlpass <br />Average ripping length : 500.00 feet/pass <br />Average dozer speed : _88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : _0.755 acres/hour <br />Unadjusted production : 1,217.54 cu, yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Permit/job # : M-2004-025 <br />Unadjusted production <br />per selected method : 1,217.54 cu. yds./hour <br />Site altitude : 5.600 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />Netjob correction : 0.83 multiplier <br /> <br />Adjusted unit production : 1,010.56 cu. yds./hour <br />Adjusted fleet production : 1,010.56 cu. yds./hour <br /> <br />Total job time : 6.23 hours <br />Unit cost : $0.125 per cu. yd. Total job cost : $787 <br />A C <br />
The URL can be used to link to this page
Your browser does not support the video tag.