Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name :DN1G <br />Permit or otherjob action :SO-01 <br />Task description :Create Wetland Bench <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank riooer <br />Horsepower: 240 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $40.61 NA <br />Operating cost/hour : $48.13 100 <br />Ripper op. cosUhour : $1.19 20 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $121.69 Total fleet cost/hour: $121,89 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,936 LCY factor : NA volume : 1,936 LCY <br />Source of estimated volume :4 acres at avg. 3' grade depth <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION >. <br />Job Conddion Correction Factors <br />Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 5,600 feet <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Clav -Natural bed <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net wrrection : 0.39 <br />Adjusted unit production : 402.60 LCY/hr <br />Adjusted fleet production : 402.80 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.81 Hours <br />Unit cost : $0.302 /LCY Total job cost : $585 <br />Task # : O3a State :Colorado PermiUjob# : M-2004-025 <br />Date : 02/11/2005 County :Delta Abbreviation :none <br />User : SSS Site :North Fork Pif Filename :M025-03a <br />