Laserfiche WebLink
Tay Tonoui <br />Sr. Environmental Engineer/ <br />Land Manager <br />PH: (970) 824-1579 <br />Fax: (970) 824-1598 <br />February 2, 2007 <br />Mr. James R. Stark <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />FEB 0 6 2007 <br />Division of Reclamauon, <br />Mining and Safety <br />RE: Colowyo Mine C-1981-019, Revision No PR-02 <br />Response to DBMS Preliminary Adequacy Letter for South Taylor Baseline and <br />Mine Plan and Lower Wilson Baseline. <br />Dear Mr. Stark, <br />This letter addresses the hydrology related comments of the Colorado Division of Reclamation <br />Mining & Safety adequacy letter for the Colowyo PR 02 dated October 12, 2006. -Specifically, <br />the entire Exhibit 7-20 document is provided, along with Maps 33 and 41A. These mataerials <br />include a revised design for the three sediment ponds and associated ditches for the South Taylor <br />mine plan. Attached is a tracking sheet for this submittal. <br />Specifically, the following review comments. are addressed in this package: 40-58, 80, and 106- <br />107. <br />If you have any questions or require additional information, please don't hesitate in contacting <br />me at the phone number above. ~ ~ ' <br />Sincerely, <br />Tay T ozzi ~f/ <br />Senior Environmental Engineer/ <br />Land Manager <br />Encl. 3 copies <br />Colowyo Mine • 5731 State Highway 13 • Meeker, Colorado 81641 <br />T +1 970 824 1500 • F +1 970 824 1504 • www.rtea.com <br />