My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102490
DRMS
>
Back File Migration
>
Revision
>
REV102490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:08 AM
Creation date
11/22/2007 12:55:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
6/27/2003
Doc Name
OSM Mine Plan Decision Doc, Table of Contents-Section 1-4
From
OSM
To
DMG
Type & Sequence
PR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U.S. Department of the Interior <br />Bureau of Land Management <br />2465 S. Townsend Avenue <br />Montrose, Colorado 81401 <br />U.S. Department of Agriculture <br />Forest Service <br />2250 Highway 50 <br />Delta, Colorado 81416 <br />FINAL ENVIRONMENTAL IMPACT STATEMENT <br />IRON POINT EXPLORATION LICENSE <br />IRON POINT COAL LEASE TRACT <br />ELK CREEK COAL LEASE TRACT <br />FEBRUARY 18, 2000 <br />Dear Ladies and Gentlemen: <br />Endosed for your review is the North Fork Coal Final Environmental Impact Statement (EIS). <br />This document describes the existing environmental conditions and the potential effects <br />associated with the leasing of the Iron Point and Elk Creek Coal Lease Tracts located in Delta <br />and Gunnison counties, Colorado. The EIS also describes the environmental effects of <br />granting a coal exploration license on an area within and surrounding the Iron Point Coal Lease <br />Tract. <br />The U.S.D.I. Bureau of Land Management (BLM) and the U.S.D.A. Forest Service (Forest <br />Service) are the joint lead agendes in the preparation of this EIS. The Office of Surface Mining <br />Redamation and Enforcement (OSM) is a cooperating agency on this EIS. <br />To aid in the preparation of the Draft EIS, we held a public scoping meeting on Wednesday, <br />April 21, 1999 in Hotchkiss, Colorado. The Draft EIS was published and available for public <br />review and comment on September 3, 1999. An informational public meeting was held on <br />October 7, 1999. A public hearing was held on October 14, 1999 to accept testimony and <br />comments. Both meetings were held in Hotchkiss, Colorado. The public comment period <br />ended on November 3, 1999. The healthy debate and many constructive comments generated <br />during the public involvement process greatly assisted the BLM and the Forest Service in <br />identifying issues and preparing the environmental analysis in this Final EIS. We want to thank <br />you for your partidpation in this project and hope you find the analysis responsive to your <br />concerns. <br />Some of the key issues for this project include: the potential effects of coal shipping from the <br />North Fork Valley on the Union Pacific Railroad; the effects of increased coal truck traffic on <br />State Highway 133; the potential effects to the integrity of watersheds and irrigation fadlities <br />within and surrounding the lease tracts, induding the Terror Creek Ditch and the Terror Creek <br />Reservoir; the effects to the local sodal and economic structure in Delta and Gunnison <br />counties; and the cumulative effects that coal exploration and mining might have on the region. <br />
The URL can be used to link to this page
Your browser does not support the video tag.