Laserfiche WebLink
• <br />m • <br />s <br />a <br />Table 2 <br />Smalt Dumps <br />Reclamation Cost <br />Area: Borrow Rrea <br />Recanlouring: <br />FeAi line: <br />Rip: <br />Soil Analysis: <br />Seeding: Slope <br />Dtaging: Slope <br />H}dromulch: <br />Trees & Shrubs; <br />Foreman <br />7 <br />Acres <br />2 <br /> Production Rates CosVUnit Volumes & Areas <br /> CY/Hr. Acreshir. $lAcre GY Acres <br />Recontouring: 677 - 6000 - <br />Fertilize: 1.5 165.56 2.0 <br />Rip: - 1.0 154.39 _ 2.0 <br />Soil Analysis: - 4.0 # 72.00 _ 2.0 <br />Seeding: Slope 1.0 220.17 2.0 <br />Draging: Slope - 2.5 61.39 2.0 <br />Hydromulching: 0.6 604.06 2.0 <br />Trees 8 Shrubs: - 0.5 185.74 2.0 <br />Prod. Labor Equip. Material Hourly Total <br />Equip. Number Units Rate Hours Cost Cost Cost Cast Cost <br />D9N 1.D 6000 677 9 23.26 131.88 - 156.14 1396 <br />D8N 1.0 2 1.5 1 23.28 112.08 80.60 225.94 226 <br />D9N 1.0 2 1.0 2 23.26 131.88 - 155.14 310 <br />- - 2 4.0 - - 18.00 18.00 144 <br />Hand 3.0 2 3.0 1 17.87 - 616.48 634.35 1903 <br />D8N wlchain 1.0 2 2.5 1 23.28 130.94 154.20 154 <br />Hydromulcher 1.0 2 0.6 3 54.25 17.34 264.00 335.59 1007 <br />- 3.0 2 1.5 1 17.87 - 75.00 92.87 279 <br />Piekup 1.0 - 17 34.79 11.57 46.36 788 <br />Total Cast <br />6207 <br /> <br />