My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102285
DRMS
>
Back File Migration
>
Revision
>
REV102285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:54 AM
Creation date
11/22/2007 12:53:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/23/1998
Doc Name
DESERADO MINE C-81-018 MR 113 1998 EXPLORATION
From
DMG
To
DAN MATHEWS
Type & Sequence
MR113
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SlIMP1AAY cont'd <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT 6 SPECIAL HANDLING <br />Task p~ Task Description ~ Cost I$) <br />46 ~ Redistri bute topsoil over D-PO[tal area ~ 560.81] <br />96 ~ Replace topsoil on regraded water storage area ~ 57,531 <br />4] ~ Replace topsail on Eas[ and West haul toad ~ 558,505 <br />48 ~ Replace topsail on refuse area RP-2/3 and 9 ~ $111,839 <br />49 ~ Replace topsoil on refuse area RP-1 ~ 570,682 <br />SO ~ Replace topsoil on refuse area 6a ~ 5121,959 <br />S1 ~ Replace topsoil on loadout loop area ~ 544, ]B1 <br />52 ~ Replace topsoil on Slot storage area ~ 54,]56 <br />53 ~ Replace topsoil on alluvial yell area ~ 51,152 <br />54 ~ Replace topsoil on overland conveyor corridor ~ 519,297 <br />55 ~ Replace topsoil at County Road 65 intersection ~ 563 <br />56 ~ Replace topsoil from D-Pore al to vent area ~ 511,983 <br />B] ~ Topsoil Drill Pads LW9-1 and LW9-2 ~ $249 <br />BR ~ Topsoil Access Road Leading Co LW9-1 fi LW9-2 ~ $566 <br />69 ~ Topsoil Access Road Leading to LW9-3 ~ $43] <br />60 ~ Topsoil Drill Pads ~ 52,385 <br />61 ~ Topsoil Access Roads ~ 51,750 <br />62 ~ Topsoil Drill Pad LW9-7 ~ $322 <br />fi7 ~ Aep lace Topsail on Pond 6a ~ 53,829 <br />64 ~ Replace Topsoil on Drill Pads/Ponds/Flow Cells/D itch $1, 94R <br />65 ~ Replace Topsoil on Rock Dust Facility ~ $328 <br />66 ~ Redistribute Topsoil on Pond, Road, and Laydovn Ares $992 <br />Subtotal (J1: $480.60] <br />sheet 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.