Laserfiche WebLink
RECLAMATION COST SlIMP1AAY cont'd <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT 6 SPECIAL HANDLING <br />Task p~ Task Description ~ Cost I$) <br />46 ~ Redistri bute topsoil over D-PO[tal area ~ 560.81] <br />96 ~ Replace topsoil on regraded water storage area ~ 57,531 <br />4] ~ Replace topsail on Eas[ and West haul toad ~ 558,505 <br />48 ~ Replace topsail on refuse area RP-2/3 and 9 ~ $111,839 <br />49 ~ Replace topsoil on refuse area RP-1 ~ 570,682 <br />SO ~ Replace topsoil on refuse area 6a ~ 5121,959 <br />S1 ~ Replace topsoil on loadout loop area ~ 544, ]B1 <br />52 ~ Replace topsoil on Slot storage area ~ 54,]56 <br />53 ~ Replace topsoil on alluvial yell area ~ 51,152 <br />54 ~ Replace topsoil on overland conveyor corridor ~ 519,297 <br />55 ~ Replace topsoil at County Road 65 intersection ~ 563 <br />56 ~ Replace topsoil from D-Pore al to vent area ~ 511,983 <br />B] ~ Topsoil Drill Pads LW9-1 and LW9-2 ~ $249 <br />BR ~ Topsoil Access Road Leading Co LW9-1 fi LW9-2 ~ $566 <br />69 ~ Topsoil Access Road Leading to LW9-3 ~ $43] <br />60 ~ Topsoil Drill Pads ~ 52,385 <br />61 ~ Topsoil Access Roads ~ 51,750 <br />62 ~ Topsoil Drill Pad LW9-7 ~ $322 <br />fi7 ~ Aep lace Topsail on Pond 6a ~ 53,829 <br />64 ~ Replace Topsoil on Drill Pads/Ponds/Flow Cells/D itch $1, 94R <br />65 ~ Replace Topsoil on Rock Dust Facility ~ $328 <br />66 ~ Redistribute Topsoil on Pond, Road, and Laydovn Ares $992 <br />Subtotal (J1: $480.60] <br />sheet 6 of 10 <br />