Laserfiche WebLink
<br />RECLAMATION COST 9GMMARY cont'd <br />E. EARTHWORK - RIPPING <br />Task q~ Task Description <br />N/A ~ Aip all parking lo[ and access road pavement ~ <br />included in Task p20, beiov <br />2'1 ~ Rip Drill Pad Access Roads ~ <br />2B ~ Rip and Regrade Coal Laydovn Atea <br />29 ~ Rip and Regrade Road <br />30 ~ Rip 6 Remove all Parking Lo[ b Access Road Pavement <br />-~ <br />Subtotal (EI <br />F. EARTHWORK - ROAD RECLAMATION <br />Cosc IS) <br />5598 <br />$161 <br />$133 <br />$60,701 <br />$51,583 <br />Taek q~ <br />____-_' Task Description ~ <br />____________________________________________________I Cost (5) <br />____________ <br />31 ~ Regrade p1anC access/haul roads ~ $130,010 <br />72 ~ Regrade east portion of refuge haul road ~ $48,92'1 <br />33 ~ Regrade access road at explosives storage ~ 519,561 <br />N/A ~ Drill/degas hole access roads - Incl. Task q12 <br />N/A ~ Water storage access road - Incl. Task q6 <br />N/A ~ Explosives storage area rd. - Incl. Task q23 <br />N/A ~ Ventilation entry area road - Inc 1. Task q7 ~ <br />N/A ~ Alluvial vellfield area rd. - Incl. Task qe ~ <br />N/A ~ Overland conveyor access rd. - Incl. Task q9 ~ <br />J4 ~ Haul Roadbas e, EOk of Coal and Laydovn Base ~ Sfi63 <br />35 ~ Grade Access Road Leading to LW9-1 and LW9-2 ~ $'182 <br />3fi ~ Grade Access Road Leading [o LW9-3 ~ 5604 <br />37 ~ Grade Access Roads ~ $3, ]E1 <br />_______ _____________________________________________________ <br />Subtotal (F): ____________ <br />$203,828 <br />sheeC 3 of 30 <br />