Laserfiche WebLink
EST IMAT INC FORM - REVEGETAT ION WORK co nt'd <br />B. SHRUB 6 TREE TRANSPLANTS <br />____________________________ I <br />SPECIES NAME ( QDAN./ACRE ( <br />No trareplants required) ' <br />I <br />I I <br />I I <br />I I <br />I I <br />____________________1=====.,,====1=== <br />C. SEEDBED PREPARATION <br />Tilling method ql: <br />#2: <br />D. SEED APPLICATION <br />Filename CO1B-122 sheet 2 of 2 <br />MATERIAL: PLANTING: $/PERT. TOTAL TOTAL <br />STOCK TYPE 6 SIZE ( 5/PLANT ( 5/PLANT ( PELLET S/PLANT ( 5/ACRE <br />_ ___ ____ I I <br />I I <br />I I <br />I I I <br />I <br />I <br />I I I <br />I I <br />I I <br />I I 50.00 <br />I I <br />I I <br />_ =I I <br />Total I <br />I <br />I <br />trans )ant I I <br />I I <br />I I <br />cost/acre: <br /> <br /> <br />==$0.00= <br />disc harrowing •• <br />596.80 <br />_________________________________ <br />Total __________ <br />cost/acre: <br />$96. <br />80 <br />Total <br />________________________ cost/acre: _= 5150. 00 <br />Seeding method: broadcast seeding 1'9J contr. data) <br />E. FERTILIZING <br />Ma ce ria is used #1: <br />q2: <br />q3: <br />Applicac ion method #1: <br />q2: <br />F. MULCHING <br />Total application cost/acre: <br />MULCH / NETTING / OTRER MATERIALS UNITS/ACRE UNIT 5/UNIT 5/ACRE <br />Materials used pl: straw (delivered) - ton I 2.00 ton 575.28 5150.56 <br />#z: I I I f <br />#J: I I I I <br />q4: I I I I <br />Application method #1: crimping Ivich tractor) <br />q2: <br />p3: <br />__________________________ <br />G. JOB COST <br />Total area to be seeded: 3.69 acres. <br />Estima ced failure rate: 50.004 of area. <br />FEATI LIZER / SOIL AMENDMENT ( UNITS/ACRE I UNIT <br />I I S/UNIT I <br />I I 5/ACRE <br /> I i <br />I I <br />Total materials I I <br />I I <br />cost/acre: <br />Total application cost/acre: $41.41 <br />Total 5/acre 5546. 85 Total Initial Job Cost= $2, O17. EB <br />Total 5/ac re• =5354 i 6B TOCal Reseeding Costs = '•= 5659. 75 <br />• Reseeding cost items: A C D <br />Total materials cost/acre: 5150.56 <br />591.41 <br />GRAND TOTAL JOB COST = 52.6'12.63 <br />