Laserfiche WebLink
RECLAMATION COST SUMMAR'f cone d <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through P1: 55,890,52] <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD S PROFIT <br />Item q~ <br />______ Item Description <br />_ _____________________ <br />_______ <br />____ ~ <br />______I_ Cost I$) <br />___-______ <br />1. ~ Public Liability Insurance..... 1.550} of di recd 591.30] <br />2. ~ Contractor's Performance Bond.. 0.850} of direct 550,659 <br />3. ~ Contractor's Pro Eic............ 10.00} of drrect~ 5589,053 <br />4. ~ <br />_______ Job Superintendent.. <br />___________________________________ <br />_______ <br />____ ~ <br />________ 595,242 <br />__________ <br />Subtotal (A1: $626,256 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 S P): 56,716,783 <br />0. DMG PROJECT ADMINISTRATION E%PI.NSES <br />Item q~ Item Description ~ Cost (5) <br />1. ~ Project engineering fees at.... 4.25} of cntr. ~ 5285,963 <br />2. ~ Staff admin. expense 0.75} of cntr. ~ $50,510 <br />Subtotal (BI: 5339,979 <br />TOTAL INDIRECT RECIN9AT ION COSTS (subtotals A through BI: $1,162,230 <br />NET INDIRECT COST PERCENTAGE: 19.731 <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIRECT' <o5ta): 5],052,757 <br />III. BOND STATUS -- BOND RELEASE SUMN~RY <br />No bond releases have been granted <br />sheet 30 of 10 <br />