Laserfiche WebLink
-; =r" <br />LIST OF STIPULATIONS <br />The following stipulations will become a binding part of the mining and reclamation <br />permit. An explanation of the of these stipulations can be found in the Division's Permit <br />Renewal Decision and Findings of Compliance document. <br />STIPULATION NO. 1 <br />IF, DURING THE COURSE OF MINING OPERATIONS, PREVIOUSLY <br />UNIDENTIFIED CULTURAL RESOURCES ARE DISCOVERED, THE <br />PERMIT"CEE SHALL ENSURE THAT THE SITE(S) IS NOT DISTURBED AND <br />SHALL NOTIFY THE REGULATORY AUTHORITY. THE OPERATOR SHALL <br />ENSURE THAT THE RESOURCE(S) IS PROPERLY EVALUATED IN TERMS OF <br />NATIONAL REGISTER ELIGIBILITY CRITERIA (36 CFR 60.6). SHOULD A <br />RESOURCE BE FOUND ELIGIBLE FOR LISTING IN CONSULTATION WITH <br />THE REGULATORY AUTHORITY, THE LAND MANAGING AGENCY (IF THE <br />SITE IS LOCATED ON FEDERAL LANDS) AND THE STATE HISTORIC <br />PRESERVATION OFFICE, THE OPERATOR SHALL CONFER WITH AND <br />OBTAIN THE APPROVAL OF THESE AGENCIES CONCERNING THE <br />DEVELOPMENT AND IMPLEMENTATION OF MITIGATION MEASURES. <br />STIPULATION NO. 2 ('This stipulation has been satisfied and is not part of this permit <br />renewal) <br />STIPULATION NO. 3 <br />IF THE PROPOSED UNDERGROUND DEVELOPMENT WASTE PII_E EXCEEDS <br />1,000 CUBIC YARDS, THE APPLICANT MUST CONSULT WITH THE DNISION <br />ABOUT THE ADDITIONAL ENGINEERING INFORMATION AND PLANS <br />REQUIRED. THE INFORMATION AND PLANS SHALL BE SUBMITTED TO <br />THE DNISION FOR REVIEW AND APPROVAL PRIOR TO EXPANSION OF <br />THE UNDERGROUND DEVELOPMENT WASTE PILE. <br />STIPULATION NO. 4 <br />THE O.C. MINE NO. 2 WILL CONTINUE TO PURSUE THE PERMITTING OF <br />THE 120 ACRE B.L.M. LEASE MODIFICATION AREA NORTH OF THE <br />CURRENT PERMIT AREA. THE OPERATOR SHALL SUBMIT A COMPLETE <br />PERMIT REVISION APPLICATION FOR THE 120 ACRE AREA NO LATER <br />THAN JULY 20, 1992. <br />