My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102250
DRMS
>
Back File Migration
>
Revision
>
REV102250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:52 AM
Creation date
11/22/2007 12:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987127
IBM Index Class Name
Revision
Doc Date
1/28/1999
Doc Name
BUTALA PIT M-87-127 EXTENSION OF REVIEW PERIOD FOR RECLAMATION COST ESTIMATE
From
DMG
To
BUTALA CONSTRUCTION
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ill 1111111111111111 <br />~ STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1113 Sherman St., Room ? 15 <br />Denver, Colorado 80:07 <br />Phone. (303) 866-3567 <br />FAx~. (303183?-8106 <br />January 28, 1999 <br />Mr. Frank J. Butala <br />Butala Construction <br />P.O. Box 907 <br />Salida, CO 81201 <br />1tE: Butala Pit (Permit M-87-127) Extension of review period for reclamation cost estimau <br />Deaz Mr. Butala: <br />Uf of SPUN OF <br />MINERALS <br />-~_ <br />GEOLOGY <br />a ECr~NrrioN <br />~INfNG•S rFETY <br />Bdl Owens <br />Gmernor <br />Greer E. Walther <br />EKeculrve Director <br />n.vchael8 Lung <br />DueClor <br />This is to acknowledge the Division's receipt of your letter of January 18, 1999 requesting an exunsion of <br />the review period for the reclamation cost estimau provided to you by Jim Dillie on November 17, 1998. <br />Based on our meeting on January 14, 1999, the Division is agreeable to extending that review period to <br />May 31, 1999. Such an exunsion will allow the siu to be inspected in May and verification made of <br />reclamation completed in order that revision of the reclamation cost estimate might be considered. M <br />inspection in May will also allow a demonstration to be made of there being enough topsoil available at the <br />site for the Division to consider a revision of the reclamation plan eliminating the current permit <br />requirement that topsoil be imported for reclamation purposes. If approved, such a revision would also bear <br />on the reclamation cost estimate. <br />Therefore, prior to the Division's inspection in May, Butala Construction should provide a map which 1) <br />illustraus the reclamation that has been completed at the site and 2) provides data both on the thickness and <br />exunt of topsoil on siu such that an estimate can be made of the volume of topsoil preunt <br />If you have any questions on the above, please contact me or Jim Dillie. <br />Sincerely, <br />James C. Suvens <br />Sr. Specialist <br />99N06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.