Laserfiche WebLink
III IIIIIIIIIIIII III <br />STATE OF COLUI~UU <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1 11 S Shaman SL, Room 215 <br />Denver, Colorado x0201 <br />F'nune: 1+0~1 aha-ast,~ <br />FAX: 111)11 x32-BIOh <br />November I I. 1997 <br />Mr. Phil George <br />Ranch Manager <br />Cross Mountain Ranch <br />P.O. Box 897 <br />Craig, CO 81626 <br />Re: Mine 2, C-81-071, SL-06 Follow-up Bond Release Inspection <br />Dear Mr. George: <br />I~~~~ <br />DEPAR'T'MENT OF <br />NATURAL <br />RESOUiZCES <br />Roy Romer <br />Governor <br />tames S. Lochhead <br />Exec Wive Director <br />Michael B. Long <br />Division Director <br />The letter the Division mailed on November 7, 1997 confirming the follow-up inspection for the Mine 2 <br />Bond Release inspection inadvertently left of the date of the scheduled inspection. The Division will <br />conduct a follow up inspection for the Mine 2 Phase 11/111 bond release request area (SL-06), in order to <br />verify tfiat maintenance items noted in the October 13, 1997 inspection have been rectified. The <br />inspection will commence at I I :30 a.m, on November 18, 1997. <br />Please call me if you have any questions or if you plan to attend. <br />t <br />Specialist <br />Sincerely, <br />