My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102183
DRMS
>
Back File Migration
>
Revision
>
REV102183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:47 AM
Creation date
11/22/2007 12:52:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Revision
Doc Date
4/6/1995
Doc Name
RED CANYON MINE PN C-81-034 TR 12 REFUSE UPPER DIVERSION REDESIGN
From
DMG
To
OSM
Type & Sequence
TR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />2768 COMPASS DRZVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAX 242-7908 <br />RED CANYON MINES <br />I ~~~~~~' <br />March 25, 1995 <br />Dan Mathews <br />Division of Minerals <br />2148 Broadway, #C5 <br />and Geology <br />Grand Junction, CO 81503 <br />Re: Refuse Pile Upper Diversion Ditch <br />NOV C-95-003 - TR Application <br />Permit C-81-034 <br />Dear Mr. Mathews: <br />C ~~ ~~~ <br />t ~, <br />.e i a <br />~--~. <br />'p~"rs~.0u ct &: n.+rals G 1i0010yv <br />Gr n~ J Ind,ou <br />The Division issued an NOV for failure to construct the refuse pile <br />upper diversion ditch in accordance with the approved design. <br />Enclosed is an application for a technical revision which addresses <br />the NOV. The Operator has committed to installing an erosion <br />control matting in the stretches of the ditch where the grade <br />exceeds 4`S. Additionally, the Operator will assure the ditch is <br />constructed in accordance with the approved plan and will submit a <br />P.E. construction certification to the Division. <br />Please extend the abatement date for the referenced NOV to allow <br />time for the Division to approve this technical revision <br />application and to allow time for the Operator to order, receive <br />and install the erosion control matting (2-3 weeks). <br />Please call if you have any questions. <br />Sincerely, <br />Jim St~.E. <br />Chief Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.