<br /> <br />Mr. John Walters -3- September 6, 1991 <br />Two apparent typos appear in the revised text: <br />1) The number of recoverable tons of coal in the permit area, Page 2-12 <br />2> The figure number for the "interburder map", Page 2-59 <br />The application for successive renewal is adequate as submitted and will be <br />approved concurrently with the permit revision. Concurrent approval is <br />necessary, due to Salt Creek Mining Company's desire to increase the permit <br />terms from the present three-year term to a term of five years (Rule <br />2.08.5(1)(a)). <br />A reclamation cost estimate has been included. The estimate reflects an <br />increase in required performance bend, due to the addition of the McClane to <br />Munger Haul Road, as well as adjustments for current reclamation work costs. <br />The Division's estimated reclamation cost is 5135,932. The Division now <br />retains a 5136,000 surety for the McClane Canyon Mine. <br />If you have questions or are in need of additional information, please call me. <br />Sincerely, <br />~, L.7'12e'~v~u~.. <br />Susan L. MOrrlsOn <br />Physical Scientist <br />SLM/gaw <br />cc: Larry Routten, MLRD <br />8061E <br />