My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102164
DRMS
>
Back File Migration
>
Revision
>
REV102164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:46 AM
Creation date
11/22/2007 12:52:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/13/2007
Doc Name
Proposed Decision & Findings of Compliance
From
DRMS
To
Mountain Coal Company, LLC
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATUS: COMPLIED WITH 10/1/1993. <br />Stipulation No. 51 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 45 <br />DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL SE <br />COMPLETED ON MB-2 AND MB-3 WITHIN 45 DAYS AFTER CONSTRUCTION OF THE PONDS IS <br />COMPLETED. (COMMENTS RECEIVED FROM THE DIVISION OF WATER RESOURCES DATED <br />SEPTEMBER 17, 1993.) <br />STATUS: COMPLIED WITH 4/3/1995. <br />Stipulation No. 52 <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT WILL OCCUR, AND <br />RECLAMATION WORK TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br />CONSTRUCTED IN LONE PINE GULCH. <br />STATUS: COMPLIED WITH 4/12/1994. <br />Stipulation No. 53 <br />ALL UNRESOLVED PERFORMANCE STANDARD ISSUES AND SUBMITTAL REQUIREMENTS SUCH <br />AS, BUT NOT LIMITED TO, GEOTECHNICAL STABILITY ISSUES, SEDIMENT CONTROL PLANS, <br />BONDING REQUIREMENTS, AND REVISED PAGE, MAP AND/OR EXHIBIT HARD COPY <br />SUBMITTALS, SHALL BE SUBMITTED AND APPROVED BY THE APPROPRIATE REVISION <br />PROCESS PRIOR TO PROJECT INITIATION. <br />STATUS: COMPLIED WITH 8/22/1994. <br />Stipulation No. 54 <br />FOR THE REFUSE PILE EXPANSION, MCC OR ITS CONSULTANTS SHOULD EITHER (1) PREPARE <br />A MORE DESCRIPTIVE JUSTIFICATION FOR THE SELECTION OF THE MECHANICAL PROPERTIES <br />USED IN COMPLETING THE ANALYSIS OR (2) PERFORM A SENSITIVITY ANALYSIS OF THE PILE <br />USING THE SELECTION OF COAL REFUSE STRENGTH VALUES CONTAINED IN THE EARLIER <br />LOWER REFUSE PILE STABILITY ANALYSIS. THIS INFORMATION SHOULD BE SUBMITTED ON <br />OR BEFORE FEBRUARY 17, 1995. THE DISPOSAL OF THE COAL WASTE SHOULD NOT BEGIN <br />UNTIL THE MFORMATION REQUIRED HAS BEEN REVIEWED BY THE DIVISION. <br />STATUS: COMPLIED WITH 2/16/1995. <br />Stipulation No. 55 <br />MCC MUST SUBMIT ADDITIONAL INFORMATION REGARDING A REPAIR PLAN FOR THE HAUL <br />ROAD. A PLAN V[EW OF THE SURFACE WATER DRAINAGE, CROSS SECTION OF BUTTRESS <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.