Laserfiche WebLink
<br />DATE: 6/29/99 <br />STAGE STOP PIT - S0. WAY CO. <br />RECLAMATION COST <br />31.8 AC <br />..L„ <br />ITEM COST/UNIT TOTAL UNITS OTAL COST <br />GRASS SEED MIX w/90$ FAILURE $269.12 AC 31.60 58,558 <br />DRILLING GRASS SEED $38.00 AC 31.80 $1,208 <br />FERTILIZER-90#/A N&P $29.00 AC 31.80 $922 <br />FERTILIZER APPLICATION $27.00 AC 31.80 $859 <br />TOPSOILING W/DOZER ------ <br />PUSH MAX. OF 250ft. ( 6"AVG) $0.50 LCY 25650.00 512,825 <br />REPLACING OVERBURDEN LCY 0.00 $0 <br />DISKING OR SCARIFYING AC 0.00 $0 <br />WEED CONTROL $20.00 AC 31.80 .5636 <br />9000#/AC GRASS HAY $150.00 AC 31.80 59,770 <br />SPREAD b CRIMP MULCH $99.00 AC 31.80 $1,558 <br />BACKSLOPING (*MINED TO SLOPE) LCY 0.00 $0 <br />MOBILIZATION $900.00 LS 1.00 $900 <br />TOTAL DIREC T RECLAMATION CO ST $32,236 <br />IN DIRECT COST <br />CONTRACTOR OVERHEAD 6 PROFI T <br />PUBLIC LIAB . INSURANCE 1.550$ 5500 <br />CONTRACTOR PERFORMANCE BOND 1.550$ $500 <br />CONTRACTOR PROFIT 10.000$ $3,224 <br /> ---59,223 <br /> DIR. W/O6P $36,959 <br />DMG PROJECT ADMIN. EXPENSES <br />MINERALS PROGRAM ADMIN. FEE AT 5.000$ 51,823 <br />TOTAL PERFORMANCE BOND AMOUNT (DIR.+INDIR.) 538,282 <br />COST/ACRE 51,203.85 <br />