Laserfiche WebLink
<br /> <br />Reclamation Cost Estimate Summary <br />Hard Rock Pavins and Redi-Mix <br />Buena Visa Pi[, Permi[ No. iV1-77-196 <br />(Revised) Conversion Application r1i~I-O1 <br />November 30, 1999 <br />Task No. Task Description Cost <br />1. Grade highwall to 2:1 6,769.04 <br />2. Grade Pit floor to neaz level 4,430.23 <br />3. Spread 6" of topsoil over sloped highwalls 498.16 <br />4. Revegetate topsoiled highwall slopes (50% failure) 3,039.27 <br />5. ~ Backfill overburden materials into pit 623.00 <br />6. Place 0.5 ft. topsoil on pit floor using 621 Cat Scraper (18 ac.) 9,311.00 . <br />7. Revegetate pit floor (18 ac.) (50% failure) 10,786.00 <br />8. Break up and bury concrete pad on site <br /> 2 hrs. at $214.39/hr. , 428.78 . <br />9. Break up and bury asphalt pad (2 hrs.) 428.78 <br />10. Remove steel ramp (dozer and low boy) 200.00 <br />11. Mob DeMob D-8 dozer, 621 scraper, Farm tractor, and seeding equipment <br /> 1 mile from Buena Vista 600.00 . _ <br />Dtrect Costs <br />Indirect Costs (18.5% of Direct costs) <br />Total Reclamation Costs <br />Administrative Fee 5% (Rule 4.2.1(5)) <br />Total Bond Estimate <br />Financial Warranty Amount <br />37,144.24 <br />6.866.13 <br />43,980.37 <br />2.199.02 <br />46,179.39 <br />M:bss~pmmVenipVn77-196 Rewcd Con Esum~e.ldo.doc <br />