My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102105
DRMS
>
Back File Migration
>
Revision
>
REV102105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:42 AM
Creation date
11/22/2007 12:52:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
5/17/1993
Doc Name
PN C-81-038 NOV C-93-030 OVWM PORTAL CUT SLIDE REPAIR
From
CYPRUS ORCHARD VALLEY
To
DMG
Type & Sequence
MR85
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M93040GE • • <br />a minimum factor of safety for stable slopes. If a factor of <br />safety of less than 1.5 is used to choose the slope inclination the <br />slope may require future maintenance. <br />A surface water diversion ditch should be constructed at the <br />ton of the slope to intercept surface water above the slope and <br />divert it away from the slope. The slide debris in the existing <br />bench drain ditch should be removed and the bench drain ditch <br />recontoured to promote rapid runoff of collected water. The drain <br />ditches should be lined with an impervious aeotextile lining to <br />reduce the potential for surface water infiltrated into the slope <br />soils. The finished surface of the slopes should be groomed to <br />remove all loose or disturbed soils and provide a relatively <br />uniform surface to promote rapid runoff of surface water. Anv <br />loose or disturbed soils on the face of the slopes should be either <br />removed or recompacted to help improve the integrity and <br />performance of the slope face. We suacest that the slope face be <br />protected farm erosion by either vegetation or aeotextile erosion <br />protective fabric. <br />5.0 POST DESIGN CONSIDERATIONS <br />We suggest that you consider a representative from our office <br />be present full time durino the earthwork operations for <br />geotechnical engineering observation and testing and to correctly <br />interpret the intent of the recommendations presented in this <br />5 <br />~Lambcrr aiiD ~ssoriares <br />CONSUL?`vG GEO'E:.n NBC LL EN GIN EENS •ND <br />MRiE~!`~L ES iING <br />
The URL can be used to link to this page
Your browser does not support the video tag.