Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2005 Monthly Report <br />Page 3 <br />Table 2 -December 2005 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (k) Volume of <br />Water k <br />P12 ]2/31/05 D 41.71 0.45 <br />P13 12/31/05 40.94 41.34 0.40 <br />P14 12/31/05 D 41.24 0.00 <br />P15 12/31/05 41.10 0.00 <br />Table 3 below provides the calendar year 2005 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Mauagemeot <br />March 2005 392.5 tons Sludge transferred from drying pad to tailings <br />impoundment. <br />May 2005 127.5 tons Sludge pumped from Pond #3 to drying pad. <br />July 2005 127.5 tons Sludge transferred from drying pad to tailings <br />impoundment. <br />October 2005 Sludge pumped from Pond #3 to drying pad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr.,$~ll Lyle (303) 324-2630 or (970) 325-4482. <br />F. Madrid ~ <br />onmental Coordinator III <br />Cc: Bill Lyle <br />File <br />